In order to promote the district as regional reference, the design will provide more integration between healthcare, research and educational functions.
The Azienda Sanitaria assigned the works as a consolidated contract to the Temporary Association of Companies (ATI) led by GLF S.p.A. and to the Temporary Consortium of Professionals (RTP) led by Studio Amati S.r.l. The project consist of: new access to the E.R. and roads modifications; repositioning of the San Gottardo canal (Ledra river) and new layout of the external areas; realization of the new buildings in part the III and IV next to the existing volumes.
The new building is horizontally organized in 7 levels.
Photo credits: Studio Amati Architetti