The Guglielmo Marconi Airport Masterplan provides, among the main interventions for the development of the airport, the construction of a new passenger terminal connected to the existing terminal.
The Feasibility Study is to examine in depth th existing Masterplan with the aim of defi ning all the issues concerning the development of the new terminal and all the other airport functions, such as: Both the exixting and the new terminal and the connection between the two (airside and landside); Flying areas, service areas and holding area; Other airport and support functions (cargo, general aviation, fire fighters areas etc.); landside access infrastructures.
The study shall also include the model of economic and social development according to the different scenarios evaluated.
Photo credits: 3TI progetti