LONDON AQUATIC CENTRE -

The architectural concept of the London Aquatic Centre is inspired by the fluid geometries of water in motion, creating spaces and a surrounding environment that reflect the riverside landscapes of the Olympic Park. An undulating roof sweeps up from the ground as a wave - enclosing the pools of the Centre with a unifying gesture of fluidity, while also describing the volume of the swimming and diving pools. The Aquatics Centre is designed with an inherent flexibility to accommodate 17,500 spectators for the London 2012 Games in ‘Olympic’ mode while also providing the optimum spectator capacity of 2000 for use in ‘Legacy’ mode after the Games. The Aquatics Centre is within the Olympic Park Masterplan. Positioned on the south eastern edge of the Olympic Park with direct proximity to Stratford, a new pedestrian access to the Olympic Park via the east-west bridge (called the Stratford City Bridge) passes directly over the Centre as a primary gateway to the Park. Several smaller pedestrian bridges will also connect the site to the Olympic Park over the existing canal. The Aquatic Centre addresses the main public spaces implicit within the Olympic Park and Stratford City planning strategies: the east-west connection of the Stratford City Bridge and the continuation of the Olympic Park along the canal. The Aquatics Centre is planned on an orthogonal axis that is perpendicular to the Stratford City Bridge. All three pools are aligned on this axis. The training pool is located under the bridge with the competition and diving pools located within the large pool hall enclosed by the roof. 
Photo credits: Helene Binet.
Countries: UNITED KINGDOM
Categories: SPORTS ARCHITECTURE
Status: Completed
Inaugurazione: 2011
1870 Projects