THE SHED MULTIARTS CENTER

The Shed, New York’s new center for artistic invention, opening in 2019, is a 200,000-square-foot building sited along the High Line at 30th Street.
Cities: NEW YORK
Countries: USA
Categories: CULTURAL ARCHITECTURE
Work in Progress - Progetto Architettonico: DILLER SCOFIDIO + RENFRO
Completion Date: 2019
The Shed’s flexible design will accommodate the broadest range of performance, visual art, and multi-disciplinary work. 
Two principal components comprise The Shed: an eight-level fixed base building for cultural programming and support spaces, and a telescoping outer shell that deploys over an adjoining plaza to double the building’s footprint on demand. 
 The base building includes two expansive levels of gallery space, a versatile theater, a rehearsal space, an artists’ lab, and a sky-lit event space. The shell forms a vast hall that accommodates large-scale performances, installations, and events. 
When deployed, the shell creates a 17,200-square-foot light, sound, and temperature-controlled hall that can serve an infinite variety of uses.  
The hall can accommodate an audience of 1,200 seated or 2,700 standing; flexible overlap space in the two adjoining galleries of the base building allows for an expanded audience in the hall of up to 3,000. 
The shell’s entire ceiling operates as an occupiable theatrical deck with rigging and structural capacity throughout. Large operable doors on the Plaza level allow for engagement with the public areas to the east and north when open. 
When the shell is nested over the base building, the 19,500-square-foot plaza will be open public space that can be used for outdoor programming; the eastern façade can serve as a backdrop for projection with lighting and sound support. 
The Plaza is equipped with distributed power supply for outdoor functions. 
The building is able to expand and contract by rolling the telescoping shell on rails. The Shed’s kinetic system is inspired by the industrial past of the High Line and the West Side Railyard. Through the use of conventional building systems for the fixed structure and adapting gantry crane technology to activate the outer shell, the institution is able to accommodate large-scale indoor and open-air programming on demand. 

Photo credits: Diller Scofidio + Renfro.
1781 Projects